In the last couple weeks we have really progressed on the steel on building 10 and the clubhouse:

We have poured the lower and upper floor of concrete in the rear area (fitness center) of the building, and have even recieved interior panels for the fitness center.  We have also started fire proffing the steel and are installing the exterior wall studs.  We hope to be weathered in in two weeks.

 

In the front of the building. we have completed the main grids, and the crew is busy stuffing bolts and setting pour stops to prepare for the decking.  We expect to be decked b weeks end, and pour the floor by the middle of next week.  Meanwhile, we are already recieving 2nd floor apartment panel deliveries!  Things are really going to start to rise soon!