Here are some high pictures of the site. If you click on each picture, you will see them larger. As you can see, the lower parking lots are getting graded and ready for paving. We are making great progress on foundations for building 9,10,12 & 13.

This is building 13 (beyond the cars) with the lower parking lot and building 17 (Not one of ours) in the rear, and building 8 (belongs to IMC Construction) in the fore ground.

This is building 12 in the back and 9 in the front.

Above is building 10. The clubhouse is visible.
We are expecting steel to start Monday June 16. We have been busy setting bearing plates and preparing beam pockets where necessary.

Also, we have been installing water meter vaults, and getting ready for site electric trenching.